Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the relevanssi domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/web/wp/wp-includes/functions.php on line 6121 Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ninja-forms-uploads domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/web/wp/wp-includes/functions.php on line 6121 Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wprss domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/web/wp/wp-includes/functions.php on line 6121 Deprecated: Return type of Twig\Node\Node::count() should either be compatible with Countable::count(): int, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in /var/www/html/web/app/plugins/wp-rss-aggregator/vendor/twig/twig/src/Node/Node.php on line 213 Deprecated: Return type of Twig\Node\Node::getIterator() should either be compatible with IteratorAggregate::getIterator(): Traversable, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in /var/www/html/web/app/plugins/wp-rss-aggregator/vendor/twig/twig/src/Node/Node.php on line 221 Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/web/wp/wp-includes/functions.php on line 6121 Notice: Function get_block_patterns was called incorrectly. Could not register file "/var/www/html/web/app/themes/lastu-child/patterns/bt-links-with-icons.php" as a block pattern ("Slug" field missing) Please see Debugging in WordPress for more information. (This message was added in version 6.0.0.) in /var/www/html/web/wp/wp-includes/functions.php on line 6121 Warning: Constant WP_DEBUG already defined in /var/www/html/web/wp-config.php on line 11 Warning: Constant WP_DEBUG_LOG already defined in /var/www/html/web/wp-config.php on line 12 Valmet Automotive’s Salo battery plant gets a second customer, plant extension completed | Business Turku

Valmet Automotive’s Salo battery plant gets a second customer, plant extension completed

Valmet Automotive has received a second battery manufacturing contract for the Salo battery plant. The new contract will expand the Salo plant production into high voltage batteries. At the same time, the extension of the Salo plant has been completed on schedule. The new building extends the plant’s logistics and production areas.

The new customer deal is a significant opening for the Salo battery plant, where production has so far focused on 48-volt batteries. With the new manufacturing agreement, the Salo plant will also start production of high-voltage batteries for the automotive industry. The goal is to start production already this year. Further details of the new contract cannot be disclosed yet.

Valmet Automotive’s Battery plant in Salo.

The Salo plant has been expanded by 3,500 square meters. The construction work began in late 2020, and now the total plant area is 23,500 square meters. Most of the new space will be utilized for logistical needs, but also the production area has been extended. The production line for the new battery model will be partly located in the plant extension area.

– Valmet Automotive is growing very fast in battery business. With the new customer deal for the Salo plant, we have already announced five battery manufacturing contracts in our Finnish operations. This is an integral part of our growth strategy that focuses on EV systems, says Jyrki Nurmi, SVP EV Systems, Valmet Automotive.

The new logistics facilities and production line will be supported by new and industry-leading technologies in the internal logistics. Instead of traditional forklift deliveries, automatic AMR robots will be introduced to the high-voltage battery production line to take care of material replenishments.

The recruitments for the Salo plant are continuing. During the autumn, the additional need is around 250 people. Most will be needed for positions in production, quality and logistics, but the extension of plant operations also requires more supervisors and specialists in various fields. New production personnel will be starting on a weekly basis. The plant currently employs about 500 people.

In total, Valmet Automotive has been nominated for five new customer orders for battery production at its Uusikaupunki and Salo plants since 2019.